The former Naval Powder Arsenal in Hiratsuka: a lot that remains a single factory, in 5 eras
According to the cultural property page of the City of Hiratsuka, the 380,000 tsubo (about 1.26 million square meters; later 420,000 tsubo) site of Nihon Kayaku Seizo, founded in 1905 as a joint venture between the Japanese government and 3 British companies, became the Naval Powder Arsenal when the navy bought the whole company in 1919, and after the war Yokohama Rubber received the arsenal site including the Western-style building when it was sold off.
The photographs that can be opened at Hiratsuka (Former Naval Powder Arsenal) cover 5 eras from 1961-69 to FY2007, and in every era the outline of the factory lot sits in the same position. This article sets the times the 5 photographs were taken against the years of the Western-style building that was once the general manager's office and of the general park to the north, and uses tables to check the share of built-up area in a circle centered on the station, and land prices from 2000 to 2026 against the 4 comparison locations.
When the photographs of Hiratsuka were taken
| Era | When taken |
|---|---|
| 1961-69 | 1961 to 1969 |
| 1974-78 | 1978 (no recorded month) |
| 1979-83 | 1983 (no recorded month) |
| 1987-90 | 1988 (no recorded month) |
| FY2007 | No recorded date |
A chronology of the Western-style building and the general park, and the order relative to the photographs
The sources are the cultural property page of the City of Hiratsuka, the page of the Former Yokohama Rubber Hiratsuka Factory Memorial Hall, the City of Hiratsuka's general park page, and Yokohama Rubber's page on the Hiratsuka Factory.
| Date | Event | Order relative to the photographs |
|---|---|---|
| 1906 or 1907 | A single-story wooden Western-style building with a tower is built as the office of the general manager of Nihon Kayaku Seizo | Before all 5 photographs |
| 1982 | Construction of the general park, marking the 50th anniversary of the city's municipal status, begins on the former site of the Ministry of Agriculture and Forestry's fruit tree research station | Before the 1983 photograph |
| March 1991 | The whole general park is completed | After the 1988 photograph and before FY2007 |
| April 27, 2004 | Yokohama Rubber and the City of Hiratsuka sign a gift agreement, and the city receives the building free of charge | Before FY2007 |
| July 23, 2004 | The building becomes a registered Tangible Cultural Property (building) of the nation | Before FY2007 |
| 2006 | Work to relocate and restore the building begins | Before FY2007 |
| April 2009 | The building opens in Hachimanyama Park as the Former Yokohama Rubber Hiratsuka Factory Memorial Hall | After all 5 photographs |
| March 2023 | Yokohama Rubber moves its head office functions from Minato Ward, Tokyo, to the Hiratsuka Factory | After all 5 photographs |
The FY2007 photograph was taken after the start of the work to relocate and restore the building and before the memorial hall opened.
1961-69 and 1974-78: rows of fruit trees and factory roofs
The appearance of the rows of factory roofs with the small white circle at their east end, the rows of fruit trees to the northwest, and the road running straight north and south through the lot is summarized in the commentary on the Hiratsuka (Former Naval Powder Arsenal) location page. The cultural property page quotes the assessment in a survey report that the building, though small, is certainly a fine example of Meiji-period wooden Western-style architecture. Both photographs were taken while the building still stood on the former arsenal site.
1979-83 and 1987-90: the general park under construction and before completion
The 1983 photograph comes after construction began in 1982, and the 1988 photograph comes about 3 years before the whole park was completed in March 1991. The order in which the north part of the orchard becomes bare ground and the 2 stadiums appear there is in the location commentary.
A site that stayed a single factory
According to Yokohama Rubber's page, the Hiratsuka Factory is at 2-1 Oiwake, Hiratsuka, and its site covers 255,656 square meters. That is about 77,000 tsubo, less than 20% of the 420,000 tsubo of the Nihon Kayaku Seizo site. As the location commentary notes, the factory lot in the photographs has stayed in use as a single factory without being divided into smaller pieces. The memorial hall, where the building moved, is at 1-1 Sengen-cho, a different town from the factory.
Comparing with other former factory locations
Suzuka (Former Naval Arsenal), Tsujido (Former Steel Works), Tsunashima (Former Electrical Equipment Factory), and Lazona Kawasaki are locations of former factories or arsenals. Using the land use data of the National Land Numerical Information, the share of built-up area within a 500 m radius circle was compared between 1976 and 2021.
| Location | Photograph eras | Center elevation | 1976 | 2021 |
|---|---|---|---|---|
| Hiratsuka (Former Naval Powder Arsenal) | 5, from 1961-69 to FY2007 | 9 m | 71% | 75% |
| Suzuka (Former Naval Arsenal) | 4, from 1961-69 to 1987-90 | 24.2 m | 42% | 78% |
| Tsujido (Former Steel Works) | 5, from 1961-69 to FY2007 | 12.6 m | 95% | 96% |
| Tsunashima (Former Electrical Equipment Factory) | 7, from 1945-50 to FY2007 | 3.7 m | 44% | 76% |
| Lazona Kawasaki | 7, from 1945-50 to FY2007 | 2.8 m | 80% | 96% |
Hiratsuka's rise of 4 percentage points is the second smallest after Tsujido's 1 point, and it is far apart from Suzuka's 36 points and Tsunashima's 32 points.
Checking with official land prices
The official land price (Chika Koji) point is a residential lot in Nishi-Yawata 3-chome, 787 m from the center, and its record begins in 2000. The highest up to the 2026 publication is 225,000 yen in 2000. The lowest up to the 2026 publication, 166,000 yen, appears in 7 years: the 5 years from 2013 to 2017, and 2021 and 2022.
| Year | Price |
|---|---|
| 2000 | 225,000 yen |
| 2001 | 217,000 yen |
| 2002 | 205,000 yen |
| 2003 | 196,000 yen |
| 2004 | 188,000 yen |
| 2005 | 181,000 yen |
| 2006 | 176,000 yen |
| 2007 | 173,000 yen |
| 2008 | 176,000 yen |
| 2009 | 173,000 yen |
| 2010 | 171,000 yen |
| 2011 | 169,000 yen |
| 2012 | 167,000 yen |
| 2013 | 166,000 yen |
| 2014 | 166,000 yen |
| 2015 | 166,000 yen |
| 2016 | 166,000 yen |
| 2017 | 166,000 yen |
| 2018 | 167,000 yen |
| 2019 | 167,000 yen |
| 2020 | 167,000 yen |
| 2021 | 166,000 yen |
| 2022 | 166,000 yen |
| 2023 | 169,000 yen |
| 2024 | 173,000 yen |
| 2025 | 177,000 yen |
| 2026 | 183,000 yen |
The price fell by more than a quarter from 2000 to 2013, and in the 10 years from 2013 to 2022 it stayed within a range of 1,000 yen. Even after rising for 4 years in a row from 2023, the 2026 value is about 80% of the 2000 value.
Comparing with the land prices of the 4 locations
The 2000 and 2026 values are set beside those of residential points near the 4 comparison locations. Hiratsuka and Suzuka are the 2 locations where the 2026 value is lower than the 2000 value, and Tsunashima and Kawasaki rose by a little over 50%.
| Location | Distance from the center | 2000 | 2026 |
|---|---|---|---|
| Hiratsuka | 787 m | 225,000 yen | 183,000 yen |
| Suzuka | 568 m | 80,500 yen | 48,700 yen |
| Tsujido | 543 m | 268,000 yen (2015) | 425,000 yen |
| Tsunashima | 193 m | 323,000 yen | 487,000 yen |
| Kawasaki | 521 m | 354,000 yen | 552,000 yen |
Checking by switching eras
Switching back and forth between 1979-83 and 1987-90 on the Hiratsuka location page lets you compare the orchard site before and after the park was built. Switching between 1961-69 and FY2007 also lets you confirm that the outline of the factory lot has not moved.
The prices in this article are actual examples at each point in time and do not reflect market prices after the article was written.